'''Note:''' These items are not listed in any sort of priority.  They are just projects that we would like to do sometime.
 
'''Note:''' These items are not listed in any sort of priority.  They are just projects that we would like to do sometime.
  
== Organization ==
+
== Facility Upgrades(Preliminary) ==
*Formulation and adoption of Bylaws - Completed!
+
=== Security Light On front of the building ===
 +
DONE!
 +
While we do have lighting out in the parking lot, the covered area in front of the shop can be really dark at night. My proposal is to have a motion detected light on the brick facade under the covered area between the garage door and the main entrance.
  
== Computer / Multimedia ==
+
Total cost should be below $60 and would have no effect on our electric bill.
  
== Embedded Electronics / Computing ==
+
-BSE
*RFID Security System - [[User:Dan9186|Dan9186]]
 
  
== Electric ==
+
=== Upgrading Bathroom and removing previous tenants shower. ===
*Box of Cables
+
*Install point of use water heater ~225.
Currently in the fire-room, there is a large cardboard box with an assortment of cables. We need to sort through the box, organize and determine if any of the cables are usable. If not, we can salvage the connectors and sell the cables for scrap. In order to do so we need to strip the insulation off the wires to determine the metal used. We have a bucket of copper currently started in the shop.
+
*Replace flooring/and new wax seal for tolet ~200
 +
*Remove hacked together plumbing and install the utility sink. ~75
 +
*Patch Drywall/Paint. ~0
  
Please continue and further organize following the current storage method (Thanks Dru!)
+
-BSE
  
== Mechanical ==
+
=== Storage room upgrading. ===
=== Shop Machines ===
+
* Move fridge into the room ~60
*CNC Mill - [[User:Dan9186|Dan9186]]
+
** Install outlets for appliances
 
+
* Cabinets or shelving
=== Strip/Salvage ===
+
* Shelving for walkway by batroom
*Ice maker - COMPLETED! <s>We have been given the icemaker in the shop[http://www.flickr.com/photos/midsouthmakers/5273458268/] There may be 2 good motors in addition to other usable items. It is currently located in the left-hand corner next to the fridge. Any usable small components should be placed inside the cabinets under the last set of counter-tops until we make a designated area. The scrap metal should be placed on the other side of the shop, out of the way.
 
</s>
 
 
 
== Furniture ==
 
=== Office ===
 
=== Lounge ===
 
=== Shop ===
 
=== Media / Arts ===
 
 
 
== Kitchen ==
 
=== Fixtures ===
 
=== Appliances ===
 
=== Hardware ===
 
=== Supplies / Consumables ===
 
 
 
== Arts / Crafts ==
 
 
 
== Bathroom(s) ==
 

Latest revision as of 01:01, 20 February 2015

Note: These items are not listed in any sort of priority. They are just projects that we would like to do sometime.

Facility Upgrades(Preliminary)

Security Light On front of the building

DONE! While we do have lighting out in the parking lot, the covered area in front of the shop can be really dark at night. My proposal is to have a motion detected light on the brick facade under the covered area between the garage door and the main entrance.

Total cost should be below $60 and would have no effect on our electric bill.

-BSE

Upgrading Bathroom and removing previous tenants shower.

  • Install point of use water heater ~225.
  • Replace flooring/and new wax seal for tolet ~200
  • Remove hacked together plumbing and install the utility sink. ~75
  • Patch Drywall/Paint. ~0

-BSE

Storage room upgrading.

  • Move fridge into the room ~60
    • Install outlets for appliances
  • Cabinets or shelving
  • Shelving for walkway by batroom