Difference between revisions of "Space to do list"

From MidsouthMakers - Memphis Area Hackerpace
Jump to navigation Jump to search
(Replaced content with "{{ambox|type=delete|text='''This page is currently unused due to a change in location and what priorities became. For the time being we won't use it.'''}}")
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
The purpose of this to do list is for things that have already been approved and are just waiting to be done.  If you are looking to make changes to the space and do not see it on here then do not do it yet.  This is not just the decision of the [[Board of Directors|Board]], but also a requirement of the landlord in our lease.  Either follow this simple rule or run the chance of costing the group the space.  If there is something that you would like to see done please detail it the [[Space requests]] section and we can begin the process of approving the change/improvement.
+
{{ambox|type=delete|text='''This page is currently unused due to a change in location and what priorities becameFor the time being we won't use it.'''}}
 
 
The items that need doing will be split up by what area of the space they are in and then further details shall be included with them in some manner.  If someone is already slotted to do a particular task, do not start on it without working through them (i.e. offer to help).
 
 
 
==House==
 
=== Living Room ===
 
{{space request
 
|title = Front Room Power Outlets
 
|initiator = Orias
 
|status = Completed
 
|materials = * 20 amp Heavy Duty Duplex Outlet x 4
 
|cost = 26
 
|time = 30 Minutes
 
|people = 1-2
 
|details = A few of the outlets in the front room are either broken or loose.  Simply pulling out the old ones and replacing them with new ones should solve the problem.
 
|pictures = {{Gallery
 
|title=
 
|width=120
 
|height=120
 
|lines=0
 
|File:Living Room Broken Outlet.JPG|alt1=Broken Outlet
 
}}
 
}}
 
{{space request
 
|title = Front Door Switches
 
|initiator = Orias
 
|status = Approved
 
|materials = * 1 new throw switch
 
* 1 motion sensitive switch - to control the front room lights
 
* 1 double gang old construction electrical box
 
|cost = 30
 
|time = 30 Minutes
 
|people = 1-2
 
|details = As part of getting the lamp to work out front the switch inside the house may need replacing and rewiring.
 
|pictures =
 
}}
 
 
 
{{space request
 
|title = Front Door Sign/Logo
 
|initiator = Jwoodjr
 
|status = Completed
 
|materials = * Vinyl logo
 
|cost =
 
|time = 15 Minutes
 
|people = 1
 
|details = Some sort of sign/logo put up on the front door to provide a small amount of identification to the space for new people
 
|pictures =
 
}}
 
 
 
=== Kitchen ===
 
 
 
=== Bathroom ===
 
{{space request
 
|title = Paper Towel Dispenser
 
|initiator = Paul
 
|status = Approved
 
|materials = * Towel Dispenser
 
|cost = Free
 
|time = 10 Minutes
 
|people = 1-2
 
|details = Paul was kind enough to donate a paper towel dispenser to the group.  It is all set to hang it in the bathroom on the wall immediately left of the mirror and stock with towels from under the sink.
 
|pictures =
 
}}
 
 
 
=== Fire Room ===
 
 
 
=== Front Porch ===
 
 
 
{{space request
 
|title = Front Porch Light
 
|initiator = Orias
 
|status = Approved
 
|materials = * Jar Light
 
* Round power box
 
|cost =
 
|time = 1 Hour
 
|people = 1
 
|details = There is no light outside on the front porchWe would like to have one to light up the front door just a little.
 
|pictures = {{gallery
 
|title =
 
|lines = 0
 
|width = 120
 
|height = 120
 
|File:Front Porch Light Box.JPG|alt1=Old Box
 
}}
 
}}
 
 
 
==Shop==
 
* Accurate measurement of house shop and room under the mezzanine
 
* Put primer on the south wall of the shop so we can put a logo/mural or something else up there
 
* Outside the door the cement wall can be primed and prepped to paint something on it
 
 
 
==Yard==
 
* Attempt measuring the yard to the best possible means
 

Latest revision as of 07:02, 23 July 2012