Space to do list/Completed
Jump to navigation
Jump to search
House
Living Room
Front Door Sign/Logo | |
---|---|
Initiator | Jwoodjr |
Status | Completed |
Materials Needed |
|
Estimated Cost | |
Estimated Time | 15 Minutes |
People Needed | 1 |
Details | Some sort of sign/logo put up on the front door to provide a small amount of identification to the space for new people |
Living Room Window | |
---|---|
Initiator | Orias |
Status | Completed |
Estimated Cost | |
Estimated Time | |
People Needed | 2-3 |
Details | The window in the living room needs to be resealed. It is currently using scotch tape to keep the outdoors out and the indoors in. It is also possible that the frame around the window needs to be redone as it might be rotten. |
Front Office
Front Office Window | |
---|---|
Initiator | Orias |
Status | Completed |
Estimated Cost | |
Estimated Time | |
People Needed | 2-3 |
Details | The frame around the window needs to be redone as it is very rotten. |
Kitchen
Bathroom
Paper Towel Dispenser | |
---|---|
Initiator | Paul |
Status | Completed |
Materials Needed |
|
Estimated Cost | Free |
Estimated Time | 10 Minutes |
People Needed | 1-2 |
Details | Paul was kind enough to donate a paper towel dispenser to the group. It is all set to hang it in the bathroom on the wall immediately left of the mirror and stock with towels from under the sink. |