Difference between revisions of "Space to do list"
Jump to navigation
Jump to search
(start of changes to archive completed things) |
(→Living Room: moving completed) |
||
Line 10: | Line 10: | ||
==House== | ==House== | ||
=== Living Room === | === Living Room === | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
{{space request | {{space request | ||
|title = Front Door Switches | |title = Front Door Switches | ||
Line 38: | Line 21: | ||
|people = 1-2 | |people = 1-2 | ||
|details = As part of getting the lamp to work out front the switch inside the house may need replacing and rewiring. | |details = As part of getting the lamp to work out front the switch inside the house may need replacing and rewiring. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|pictures = | |pictures = | ||
}} | }} |
Revision as of 20:46, 4 April 2011
This page is designated for already approved things to do. If you are looking to request or propose something please refer to the Space requests page. |
Completed items can be found on the Completed subpage. |
The items that need doing will be split up by what area of the space they are in and then further details shall be included with them in some manner. If someone is already slotted to do a particular task, do not start on it without working through them (i.e. offer to help).
House
Living Room
Front Door Switches | |
---|---|
Initiator | Orias |
Status | Approved |
Materials Needed |
|
Estimated Cost | $30.00 |
Estimated Time | 30 Minutes |
People Needed | 1-2 |
Details | As part of getting the lamp to work out front the switch inside the house may need replacing and rewiring. |
Front Office
Front Office Window | |
---|---|
Initiator | Orias |
Status | Completed |
Estimated Cost | |
Estimated Time | |
People Needed | 2-3 |
Details | The frame around the window needs to be redone as it is very rotten. |
Kitchen
Bathroom
Paper Towel Dispenser | |
---|---|
Initiator | Paul |
Status | Completed |
Materials Needed |
|
Estimated Cost | Free |
Estimated Time | 10 Minutes |
People Needed | 1-2 |
Details | Paul was kind enough to donate a paper towel dispenser to the group. It is all set to hang it in the bathroom on the wall immediately left of the mirror and stock with towels from under the sink. |
Fire Room
Front Porch
Front Porch Light | ||||
---|---|---|---|---|
Initiator | Orias | |||
Status | Approved | |||
Materials Needed |
| |||
Estimated Cost | ||||
Estimated Time | 1 Hour | |||
People Needed | 1 | |||
Details | There is no light outside on the front porch. We would like to have one to light up the front door just a little. | |||
Pictures |
Front Porch Paint | ||||
---|---|---|---|---|
Initiator | Dan9186 | |||
Status | Approved | |||
Materials Needed |
| |||
Estimated Cost | ||||
Estimated Time | 3 Hour | |||
People Needed | 1-2 | |||
Details | The paint over the front porch is peeling and coming undone. We need to strip/scrape off the old paint and then repaint it to seal it up. | |||
Pictures |
Shop
- Accurate measurement of house shop and room under the mezzanine
- Put primer on the south wall of the shop so we can put a logo/mural or something else up there
- Outside the door the cement wall can be primed and prepped to paint something on it
Yard
- Attempt measuring the yard to the best possible means