Difference between revisions of "Space to do list"

From MidsouthMakers - Memphis Area Hackerpace
Jump to navigation Jump to search
(Replaced content with "{{ambox|type=delete|text='''This page is currently unused due to a change in location and what priorities became. For the time being we won't use it.'''}}")
 
Line 1: Line 1:
{{ambox|text='''This page is designated for already approved things to do.  If you are looking to request or propose something please refer to the [[Space requests]] page.'''}}
+
{{ambox|type=delete|text='''This page is currently unused due to a change in location and what priorities becameFor the time being we won't use it.'''}}
 
 
{{ambox
 
|image = [[File:Replacement filing cabinet.png|40px|link=]]
 
|text = Completed items can be found on the [[Space to do list/Completed|Completed]] subpage.
 
}}
 
 
 
The items that need doing will be split up by what area of the space they are in and then further details shall be included with them in some mannerIf someone is already slotted to do a particular task, do not start on it without working through them (i.e. offer to help).
 
 
 
==House==
 
=== Living Room ===
 
{{space request
 
|title = Front Door Switches
 
|initiator = Orias
 
|status = Approved
 
|materials = * 1 new throw switch
 
* 1 motion sensitive switch - to control the front room lights
 
* 1 double gang old construction electrical box
 
|cost = 30
 
|time = 30 Minutes
 
|people = 1-2
 
|details = As part of getting the lamp to work out front the switch inside the house may need replacing and rewiring.
 
|pictures =
 
}}
 
 
 
=== Front Office ===
 
 
 
=== Kitchen ===
 
 
 
=== Bathroom ===
 
 
 
=== Fire Room ===
 
 
 
=== Front Porch ===
 
 
 
{{space request
 
|title = Front Porch Light
 
|initiator = Orias
 
|status = Approved
 
|materials = * Jar Light
 
* Round power box
 
|cost =
 
|time = 1 Hour
 
|people = 1
 
|details = There is no light outside on the front porch.  We would like to have one to light up the front door just a little. We need to confirm the wiring is connected to the panel, before we take the time to hook up a light.
 
|pictures = {{gallery
 
|title =
 
|lines = 0
 
|width = 120
 
|height = 120
 
|File:Front Porch Light Box.JPG|alt1=Old Box
 
}}
 
}}
 
 
 
{{space request
 
|title = Front Porch Paint
 
|initiator = Dan9186
 
|status = Completed
 
|materials = * Exterior Paint
 
|cost =
 
|time = 3 Hour
 
|people = 1-2
 
|details = The paint over the front porch is peeling and coming undone.  We need to strip/scrape off the old paint and then repaint it to seal it up.
 
|pictures = {{gallery
 
|title =
 
|lines = 0
 
|width = 120
 
|height = 120
 
|File:Front Porch Peeling Paint.JPG|alt1=Peeling Paint
 
}}
 
}}
 
 
 
==Shop==
 
* Accurate measurement of house shop and room under the mezzanine
 
* Put primer on the south wall of the shop so we can put a logo/mural or something else up there
 
* Outside the door the cement wall can be primed and prepped to paint something on it
 
 
 
==Yard==
 
* Attempt measuring the yard to the best possible means
 

Latest revision as of 07:02, 23 July 2012