Difference between revisions of "Meeting notes 2010-03-26"
Jump to navigation
Jump to search
(→Agenda: starts of the agenda) |
(→Agenda: updated) |
||
Line 10: | Line 10: | ||
== Agenda == | == Agenda == | ||
− | + | * Bank Account | |
− | + | ** We will likely be using <s>Southeast Financial Credit Union</s> Regions Bank | |
− | + | ** We want to keep roughly 2 months worth of rent in the event that absolutely no one could pay (approx. $1500) | |
− | ** | + | ** We would dip into it as little as possible and would replenish it as soon as possible |
− | + | ** We have set 3 names from the board with the ability to withdraw | |
− | + | ** Any 2 of those names are required at any given time to make a withdrawal | |
− | + | ** Paperwork is missing one signature and will be filed on Monday | |
− | + | * Bylaws | |
− | + | ** The board is making more progress on the draft | |
− | + | ** These are the absolute rules that we are supposed to operate by | |
− | ** Space | + | ** Pulling a lot from other spaces and any issues/thoughts they have had |
− | + | ** Once the board is done drafting them, they will be presented to all members in various forms of media to review | |
− | + | ** In order to finalize the bylaws, they will need to be approved by the members | |
− | + | * Dues | |
− | + | ** We need to determine what is a reasonable fee for dues, without it we can not extrapolate what our income will be to see what we can afford | |
+ | ** With the bank account nearly in place we want to start collecting money ASAP to begin building our slush fund | ||
+ | ** It will likely take us 2 1/2 to 3 months to collect up the slush fund | ||
+ | ** If we do not get the slush fund built up before we get a space, it will become a lot harder for us to build it up after words | ||
+ | * Space | ||
+ | ** Everyones' involvement is requested in this | ||
+ | ** A wiki page will be formed detailing space desires and potential spaces that meet these | ||
+ | ** If you know of someone or a place that we can look into, provide info, rent details, everything you can on the wiki page | ||
+ | ** The board will be using this page to keep track of who to contact, who has been contacted, and what have been our best options thus far | ||
+ | * Soldering Class | ||
+ | ** Cost is $5 per kit, anyone and everyone is invited | ||
+ | ** We need some sort of public postings about it | ||
+ | ** We could use a flyer of some sort and see if they will mention it on Make Blog for us | ||
+ | ** Date is April 16th | ||
+ | * Show Off Projects | ||
+ | ** Mary has something to show for sure | ||
+ | * General Chit Chat | ||
== Notes == | == Notes == | ||
=== Comes to Order @ === | === Comes to Order @ === | ||
=== Meeting Adjourned @ === | === Meeting Adjourned @ === |
Revision as of 18:50, 26 March 2010
<< 2010-03-19 | Meeting Minutes | 2010-04-02 >> |
---|
Attendance
Pictures
Agenda
- Bank Account
- We will likely be using
Southeast Financial Credit UnionRegions Bank - We want to keep roughly 2 months worth of rent in the event that absolutely no one could pay (approx. $1500)
- We would dip into it as little as possible and would replenish it as soon as possible
- We have set 3 names from the board with the ability to withdraw
- Any 2 of those names are required at any given time to make a withdrawal
- Paperwork is missing one signature and will be filed on Monday
- We will likely be using
- Bylaws
- The board is making more progress on the draft
- These are the absolute rules that we are supposed to operate by
- Pulling a lot from other spaces and any issues/thoughts they have had
- Once the board is done drafting them, they will be presented to all members in various forms of media to review
- In order to finalize the bylaws, they will need to be approved by the members
- Dues
- We need to determine what is a reasonable fee for dues, without it we can not extrapolate what our income will be to see what we can afford
- With the bank account nearly in place we want to start collecting money ASAP to begin building our slush fund
- It will likely take us 2 1/2 to 3 months to collect up the slush fund
- If we do not get the slush fund built up before we get a space, it will become a lot harder for us to build it up after words
- Space
- Everyones' involvement is requested in this
- A wiki page will be formed detailing space desires and potential spaces that meet these
- If you know of someone or a place that we can look into, provide info, rent details, everything you can on the wiki page
- The board will be using this page to keep track of who to contact, who has been contacted, and what have been our best options thus far
- Soldering Class
- Cost is $5 per kit, anyone and everyone is invited
- We need some sort of public postings about it
- We could use a flyer of some sort and see if they will mention it on Make Blog for us
- Date is April 16th
- Show Off Projects
- Mary has something to show for sure
- General Chit Chat