Difference between revisions of "ToDo List"
Jump to navigation
Jump to search
Line 18: | Line 18: | ||
=== Storage room upgrading. === | === Storage room upgrading. === | ||
− | *Move fridge into the room ~60 | + | * Move fridge into the room ~60 |
+ | ** Install outlets for appliances | ||
+ | * Cabinets or shelving | ||
+ | * Shelving for walkway by batroom |
Revision as of 18:18, 17 December 2014
Note: These items are not listed in any sort of priority. They are just projects that we would like to do sometime.
Facility Upgrades(Preliminary)
Security Light On front of the building
While we do have lighting out in the parking lot, the covered area in front of the shop can be really dark at night. My proposal is to have a motion detected light on the brick facade under the covered area between the garage door and the main entrance.
Total cost should be below $60 and would have no effect on our electric bill.
-BSE
Upgrading Bathroom and removing previous tenants shower.
- Install point of use water heater ~225.
- Replace flooring/and new wax seal for tolet ~200
- Remove hacked together plumbing and install the utility sink. ~75
- Patch Drywall/Paint. ~0
-BSE
Storage room upgrading.
- Move fridge into the room ~60
- Install outlets for appliances
- Cabinets or shelving
- Shelving for walkway by batroom