The items that need doing will be split up by what area of the space they are in and then further details shall be included with them in some manner. If someone is already slotted to do a particular task, do not start on it without working through them (i.e. offer to help).
House
Living Room
Front Door Switches
|
Initiator
|
Orias
|
Status
|
Approved
|
Materials Needed
|
- 1 new throw switch
- 1 motion sensitive switch - to control the front room lights
- 1 double gang old construction electrical box
|
Estimated Cost
|
$30.00
|
Estimated Time
|
30 Minutes
|
People Needed
|
1-2
|
Details
|
As part of getting the lamp to work out front the switch inside the house may need replacing and rewiring.
|
Front Office
Kitchen
Bathroom
Fire Room
Front Porch
Front Porch Light
|
Initiator
|
Orias
|
Status
|
Approved
|
Materials Needed
|
- Jar Light
- Round power box
|
Estimated Cost
|
|
Estimated Time
|
1 Hour
|
People Needed
|
1
|
Details
|
There is no light outside on the front porch. We would like to have one to light up the front door just a little.
|
Pictures
|
|
Front Porch Paint
|
Initiator
|
Dan9186
|
Status
|
Approved
|
Materials Needed
|
|
Estimated Cost
|
|
Estimated Time
|
3 Hour
|
People Needed
|
1-2
|
Details
|
The paint over the front porch is peeling and coming undone. We need to strip/scrape off the old paint and then repaint it to seal it up.
|
Pictures
|
|
Shop
- Accurate measurement of house shop and room under the mezzanine
- Put primer on the south wall of the shop so we can put a logo/mural or something else up there
- Outside the door the cement wall can be primed and prepped to paint something on it
Yard
- Attempt measuring the yard to the best possible means