Space to do list

From MidsouthMakers - Memphis Area Hackerpace
Jump to navigation Jump to search

The items that need doing will be split up by what area of the space they are in and then further details shall be included with them in some manner. If someone is already slotted to do a particular task, do not start on it without working through them (i.e. offer to help).

House

Living Room

Front Door Switches
Initiator Orias
Status Approved
Materials Needed
  • 1 new throw switch
  • 1 motion sensitive switch - to control the front room lights
  • 1 double gang old construction electrical box

Estimated Cost $30.00
Estimated Time 30 Minutes
People Needed 1-2
Details As part of getting the lamp to work out front the switch inside the house may need replacing and rewiring.

Front Office

Kitchen

Bathroom

Fire Room

Front Porch

Front Porch Light
Initiator Orias
Status Approved
Materials Needed
  • Jar Light
  • Round power box

Estimated Cost
Estimated Time 1 Hour
People Needed 1
Details There is no light outside on the front porch. We would like to have one to light up the front door just a little. We need to confirm the wiring is connected to the panel, before we take the time to hook up a light.
Pictures
Old Box
 
Front Porch Paint
Initiator Dan9186
Status Completed
Materials Needed
  • Exterior Paint

Estimated Cost
Estimated Time 3 Hour
People Needed 1-2
Details The paint over the front porch is peeling and coming undone. We need to strip/scrape off the old paint and then repaint it to seal it up.
Pictures
Peeling Paint
 

Shop

  • Accurate measurement of house shop and room under the mezzanine
  • Put primer on the south wall of the shop so we can put a logo/mural or something else up there
  • Outside the door the cement wall can be primed and prepped to paint something on it

Yard

  • Attempt measuring the yard to the best possible means